The short answer
A **hydrogen-embrittlement relief bake** after electroplated CNC steel is not a default oven cycle on every plated bracket, and it is not a synonym for [salt-spray testing](https://3dwk.com/resources/when-to-specify-salt-spray-after-plated-cnc-steel) or for naming a [coating family](https://3dwk.com/resources/zinc-plating-vs-electroless-nickel-vs-black-oxide). A usable callout says **whether a bake is required**, **where it sits in the sequence** (typically after electroplating, and before or after a final grind depending on the drawing), and **which standard and holding time the buyer wants cited**—if those values are required, they belong on the PDF. Silence, or a note that only says “bake as needed,” is what widens many [quote-new.php](https://3dwk.com/quote-new.php) **rates.v1.1** estimate bands—not the oven time alone.
This guide is for buyers packaging high-strength or heat-treated CNC steel that will be electroplated. Illustrations use an **Example part** only—not a customer fitting and not a process certificate. If your program needs a named method and duration, write that method on the drawing; 3DWK does not invent a guaranteed bake window. Sibling notes live in the salt-spray guide, in [plating thickness versus tolerance stack](https://3dwk.com/resources/plating-thickness-cnc-tolerance-stack), and in [when to specify 4140 steel](https://3dwk.com/resources/when-to-specify-4140-steel-for-cnc-parts); here we focus on **when an HE-bake pack is worth calling out**.
What a hydrogen bake after plating means for quoting
An **HE-bake callout** names that a relief bake is required after an electroplate on high-strength or heat-treated steel, the sequence relative to plate, grind, and any sealer, and the buyer-cited standard or duration when the program requires one. Writing “bake as needed” or “industry standard bake” is not enough. Process pages for CNC steel milling ([CNC 3-axis Steel 1018 aerospace](https://3dwk.com/en/cnc-3axis/steel-1018/aerospace.html), [CNC 3-axis Steel 1018 tooling](https://3dwk.com/en/cnc-3axis/steel-1018/tooling.html), [CNC 3-axis Steel 1018](https://3dwk.com/en/cnc-3axis/steel-1018.html)) assume the coating and any relief-bake pack are visible when lots mix mild steel, heat-treated 4140-class steel, bare parts, and plated parts.
Do not bury “HE bake as needed” inside a notes cloud. Put **HE BAKE: REQUIRED AFTER ELECTROPLATE, BEFORE FINAL GRIND OF DATUM A; CITE THE BUYER STANDARD AND HOLDING TIME ON THE PDF** on the drawing and mirror it in RFQ text. If no bake is required, say **NO HE BAKE** so the shop does not have to guess. Background: [heat treating steel after CNC machining](https://3dwk.com/resources/heat-treating-steel-after-cnc-machining), [when to specify heat treat after CNC](https://3dwk.com/resources/when-to-specify-heat-treat-after-cnc), [what files to send for a CNC quote](https://3dwk.com/resources/what-files-to-send-for-cnc-quote).
When the bake is worth calling out
Specify a hydrogen-relief bake when the steel is high-strength or heat-treated, the finish is an electroplate that can introduce hydrogen, and the program actually requires a relief step. Skip a blanket bake on mild 1018-class parts with no such requirement, and do not copy a bake note onto [black oxide](https://3dwk.com/resources/zinc-plating-vs-electroless-nickel-vs-black-oxide) by default. A bake is not a substitute for naming the coating, and it is not a salt-spray hour.
Steel bar and plate $/kg planning bands sit in the common CNC carbon-steel range under **rates.v1.1** material tables; material cost is rarely the bake-pack story—grade, heat-treat state, coating family, and sequence are.
Sequence versus grind, plate, and inspection
Name the order: machine, [heat treat](https://3dwk.com/resources/when-to-specify-heat-treat-after-cnc) if any, clean, electroplate, relief bake, then any final grind of a size-critical face, then chromate or sealer if the bake sits before that coat. Keep [MPI](https://3dwk.com/resources/when-to-specify-mpi-after-cnc-steel) or salt-spray notes on their own lines so NDT and corrosion tests are not mistaken for a bake.
Tolerance and inspection traps
Calling “bake as needed,” asking for a “standard hydrogen bake” with no method or sequence, or applying a high-strength bake note to a mild, non-heat-treated 1018 part by default, all force **needs_manual**. Default mild cosmetic-plated parts to a named coating and skip the bake unless the grade actually needs it; reserve a cited standard and holding time for high-strength or heat-treated electroplated steel. Related: [ISO 2768 general tolerances on CNC RFQs](https://3dwk.com/resources/iso-2768-general-tolerances-cnc-rfq), [what needs_manual means](https://3dwk.com/resources/what-needs-manual-means-preliminary-quote).
Illustration 1 shows an **Example part** heat-treated steel bracket with a labeled post-electroplate bake before the grind of datum A versus a cosmetic plated face left with no bake requirement.
Example part walkthrough
**Example part:** Heat-treated 4140-class steel bracket ~80 × 50 × 8 mm, electrolytic zinc plus clear chromate, HE bake required after electroplate and before the final grind of datum A, buyer-cited standard and holding time written on the PDF, rack marks excluded, ISO 2768-m general on the machined dimensions. With STEP + **HE BAKE REQUIRED AFTER ELECTROPLATE, BEFORE GRIND OF A; STANDARD AND TIME CITED ON THE DRAWING**, expect a usable automatic planning band on [quote-new.php](https://3dwk.com/quote-new.php). Same geometry with silent “bake as needed, industry standard hours” often lands DFM notes or **needs_manual**—without inventing any customer PO, bake certificate, or a 3DWK-guaranteed process window.
Illustration 2 contrasts a vague RFQ (“hydrogen bake as needed”) versus a labeled required-versus-not, sequence, and buyer-cited-method pack and the clearer estimate path.
What widens bands fastest
Unlabeled “as needed” bakes, a bake demanded with no coating family, a sequence that is silent versus grind or chromate, and a high-strength bake note copied onto mild 1018 by default. Quantity breaks help unit minutes but do not erase bake-pack ambiguity—see [how quantity breaks change CNC unit cost](https://3dwk.com/resources/how-quantity-breaks-change-cnc-unit-cost) and [plating thickness versus tolerance](https://3dwk.com/resources/plating-thickness-cnc-tolerance-stack).
What to do next
Mark the RFQ with **required or not, sequence after electroplate versus grind, and the buyer-cited standard or duration if you need one**, then upload on [quote-new.php](https://3dwk.com/quote-new.php). Packaging checklist: grade and heat-treat state, coating family, then the bake pack on its own line. Service pages: [CNC machining](https://3dwk.com/cnc-machining-service.php), [materials](https://3dwk.com/materials.php). Treat **rates.v1.1** min/mid/max as estimates, not invoices. If the UI shows **needs_manual**, answer the bake-pack questions rather than forcing a fake price.
Common questions
Does every zinc-plated steel part need a hydrogen bake?
No. The bake is typically specified on high-strength or heat-treated steels after an electroplate that can introduce hydrogen. Mild 1018-class parts with no such requirement should not inherit a bake note by default.
Can you just use a standard number of hours?
Only if you cite the standard and the duration on the drawing. 3DWK will not invent a guaranteed process window or a certificate. If your program needs a named method, write that method.
Where does the bake sit versus grinding and salt spray?
Usually after electroplating and, when a size-critical grind remains, in the order the drawing names—often before that final grind. Salt spray and MPI stay on their own lines. Do not hide a bake inside a corrosion-test note.
What if the finish is still “plate as needed”?
Name the coating family first. A bake pack cannot be planned against an unstated finish. Once the electroplate is named, say whether a bake is required and where it sits in the sequence.