Quality

Quality & Inspection

Quality starts with clear requirements. Here is how 3DWK reviews projects, controls revisions, and checks parts against the requirements agreed on your quote.

Our Approach

Quality built into the workflow

1

Requirement review

Drawings, tolerances, materials, finishes, and documentation needs are reviewed before quoting.

2

Partner matching

Projects are matched to partners whose equipment and experience fit the process, material, and tolerance.

3

Revision control

The quoted file and drawing revision are the reference for manufacturing and inspection.

4

In-process communication

Questions about features or specifications are raised with you instead of assumed.

5

Final inspection

Parts are checked against the agreed critical dimensions and visual requirements.

6

Records

Requested inspection and project records ship with the parts.

Documentation

Inspection and documentation available on request

ItemDescriptionHow to request
Dimensional inspection reportMeasured results for critical dimensionsMark critical features on your drawing and request in RFQ
First article inspection (FAI)Full check of a first part before or with productionRequest in RFQ; scope agreed on quote
CMM reportCoordinate measuring machine results where geometry requires itRequest in RFQ
Material certificateMill or material certificate for the supplied stockRequest in RFQ
Finish / plating certificateProcess certificate from the finishing sourceRequest in RFQ
Certificate of conformanceStatement that parts conform to the orderRequest in RFQ

Availability and cost depend on the project and are confirmed on the quote.

Standards

Default workmanship expectations

Edges

Sharp edges are broken and deburred unless your drawing specifies otherwise.

Tolerances

Your drawing governs. Tolerances not shown on a drawing are confirmed with you during review.

Cosmetics

Cosmetic surfaces should be identified on the drawing with any reference samples.

Cleanliness

Parts are cleaned of chips and cutting fluid before packing.

Have Quality Requirements?

Include them with your RFQ.

Inspection levels, certificates, and special requirements are easiest to plan before quoting.